Atkins Rotherham

Engineering Design Consultants

Atkins - the official engineering design services provider for the London 2012 Olympic and Paralympic Games
RSS feed
Isle of Grain 24inch Gas Pipeline Horizontal Directional Drill

Materials Handling Systems

   

Originating within the tunnelling industry and used by most of the major contractors, our materials handling department has extensive experience in the detailed design and integration of the following:

.
Spoil removal and conveying systems
.
Segment manipulation, supply and handling systems
.
Complete tunnel boring machine back-up systems
.
Shaft top and bottom material handling systems

Bulk material handling systems design expertise, principally gained from coal handling, stacking and reclaiming plant allied to the power industry, encompasses production of plant layout and detailed layout/manufacturing drawings for:

.
Conveyors and structures
.
GTUs and drives
.
Chutework and hoppers
.
Supporting bridge and trestle structures
.
Transfer towers

For more information, contact us on 01709-373782

M G Bennett and Associates Ltd is now part of the Atkins - the official engineering design services provider for the London 2012 Olympic and Paralympic Games Group
Atkins - the official engineering design services provider for the London 2012 Olympic and Paralympic Games
 

Projects

Robin Rigg Horizontal Directional Drill
Isle of Grain 24” Gas Pipeline Horizontal Directional Drill
Manjung 3x700MW Coal Fired Power Station
Bulk Handling - Tianjin Port Coal Terminal
Channel Tunnel Project
Storebaelt Tunnel
Channel Tunnel Rail Link
Tunnel Boring Machines (TBMs) "Mix & Match"
Water Industry Shaft Excavator
Novel Tunnel Segment Manipulator
Horizontal Directional Drilling
Shaft Excavator