Engineering Design Consultants

Atkins - the official engineering design services provider for the London 2012 Olympic and Paralympic Games
RSS feed

Great Wharf Road Bridge - Media Coverage

 
   
icon
Great Wharfe Road Bridge
The Architects Journal - February 2004
icon
Bridge Lifting Consultancy
Architecture Today - April 2004
icon
Big Lifter Takes up Position
Bridge Design and Engineering - Q1 2004
icon
On the Up
Contract Journal 21 April 2004
icon
RAM in position to lift 800 tonne road bridge
Civic and Public Building Specifier - Jan/Feb 2004
icon
Doing the up and under
New Civil Engineer - 21st August 2003
icon
Raising the Bridge
The Structural Engineer - March 2004
icon
Taking the strain
Transportation Professional - October 2003

 

 
   



You may also be interested in:

Robin Rigg Horizontal Directional Drill
Local Authority / Water Industry
Design and Design Verification - Finite Element Analysis


M G Bennett and Associates Ltd is now part of the Atkins - the official engineering design services provider for the London 2012 Olympic and Paralympic Games Group
Atkins - the official engineering design services provider for the London 2012 Olympic and Paralympic Games
 

Great Wharf Road Bridge hydraulic ram
Great Wharf Road Bridge hydraulic ram

Great Wharf Road Bridge pivoting clevis that connects the hydraulic ram to the bridge deck
Great Wharf Road Bridge pivoting clevis that connects the hydraulic ram to the bridge deck


Plan Design Enable