Halley base, located on the floating Brunt ice shelf in
Antarctica, is the most isolated scientific station operated by the British
Antarctic Survey. It is relieved once a year, with supplies being landed by ship
on the ice shelf and then towed on sledges seven miles to the base.
Following the erection of Halley 5 between 1988 and 1990,
consisting of three single-storey buildings on raised and jackable steel
platforms, the British Antarctic Survey decided to construct a permanent garage
facility for the various items of plant and equipment used at the base. As well
as providing enough space to house and maintain large vehicles, the building had
to be relocatable in order to counter the effects of accumulated snow and ice
that eventually bury static structures in the Antarctic.
In 1992 Bennett Associates were appointed consulting engineers for
this project and worked with VM Fabrications to design and build the structure.
The completed building, which came into use in 1993, is 16 metres
long, nine metres wide and six metres high and able to house vehicles weighing
up to 15 tonnes. The main access doors provide an opening approximately five
metres by five metres. It is fully self-contained and includes heating,
ventilation, water, electric power and compressed air supplies, provision for
waste water and oil and also various work-benches, storage and lifting
equipment. An internal temperature between +10°C and +15°C can be maintained
despite external temperatures as low as -55°C.
In order to allow the building to be moved from one position to
another on the ice shelf before it becomes ice-bound, the garage has been
mounted on a pair of skids, with low friction coatings. The skids are fully
integral with the structure to increase mechanical strength, and the building
overall is designed to be extremely rigid so it retains its squareness despite
being towing over uneven ground. It weighs approximately 18 tonnes, so it can be
pulled by a bulldozer winch once the skids have been broken free of the ice by
inflatable airbags.
The building itself and all the services and fittings have been
designed for minimal maintenance because of the cost of transporting materials
to the Antarctic and the difficult working conditions.
Bennetts designed the garage in modular form with the minimum
number of components and fixings so that it could be handled and assembled
easily by staff at the Halley base. No special tools were needed, and fixings
were a convenient size to work with, given that staff wear thick gloves
virtually all the time when outdoors at Halley.
Before the building was shipped from the UK to Antarctica, it was
fully pre-assembled and then dismantled for packing.
For more information, contact us on
01709-373782
Related links:
Bennett
Associates Design Airbus A380 wing skin creep forming facility
First
Fruits of Rotherham Firm's Input into Airbus Super-Jumbo
You may also be interested in:
M G Bennett and Associates Ltd is now part of the  Group
|