Channel Tunnel Project

 
   

Continued...

 

Bennett Associates was responsible for carrying out a full stress analysis of the cutterhead support, TBM structure and gripper body and pads which was done by Finite Element analysis using ANSYS software solid modelling elements.

The analysis was used interactively by the Robbins designers in Seattle USA. Close co-operation was maintained by visits to Seattle and exchange of AutoCad drawings on disk to ensure that the complex interface between TBM and its back-up system was correctly engineered.


For more information, contact us on 01709-373782
 
   
Previous PagePage 1Page 2Page 3Next Page


Bookmark with:
   


 
Channel Tunnel - Tunnel Boring Machine
Tunnel Boring Machine - Channel Tunnel

Channel Tunnel - Tunnel Boring Machine
Channel Tunnel - Tunnel Boring Machine
Channel Tunnel - Tunnel Boring Machine
     
Channel Tunnel - Tunnel Boring Machine
Channel Tunnel - Tunnel Boring Machine
Channel Tunnel - Tunnel Boring Machine
     
Move mouse over images to enlarge

Printable PDF
Pdf