Tianjin Port Coal Terminal

 
   

Responsibilities

Structural and Mechanical Design for conveyors, chutework and transfer towers involving the production of over 180 mechanical and design arrangement drawings developed to sufficient detail to allow detailed fabrication drawings to be produced by a third party Chinese Design Institute without recourse to further design work.

Drawings and supporting calculations were produced for the following principal elements for each conveyor/tower:

Tailframes
Headframes and Chutes
Chute Discharge Boxes and Skirts
Bifurcated Transfer Chutes and Diverters
Lifting Skirts, Dewatering Equipment
Tramp Iron Chutes
Trestle, Tower and Tail Mounted GTUs
Magnetic Separator Handling Facilities
Tower and Ground Mounted Drive Units
Tower Steelwork and Member Forces

The contract was successfully completed to budget and within the exacting timescales of the contract programme.


For more information, contact us on 01709-373782.

Related links:
.Manjung Coal Fired Power Station
.Tunnel Boring Machines

 
Tianjin Port Coal Terminal

     
     
Move mouse over images to enlarge

Printable PDF
Pdf