Atkins Rotherham

Engineering Design Consultants

Atkins - the official engineering design services provider for the London 2012 Olympic and Paralympic Games
RSS feed

Gateshead Millennium Bridge

 
   


Brief description of control systems

Movement of bridge tilting mechanism
Advanced monitoring of bridge position
Advanced control of bridge position (+/- 0.2°)
CCTV position selection
Control of 14 No electrical motors and 2 No diesel power packs Control of all pedestrian warning devices



Responsibilities:

Design and authoring of MEA&H full mechanical, electrical and hydraulic specification
Design and authoring of control system specification
Supervising consultants for all MEA&H systems
Advisors on hydraulic mathematical modeling
Dynamic modeling of bridge including hydraulic performance and PLC PID control loop



Hardware:

3 No Allen Bradley PLCs
Allen Bradley panel view 500 operator terminal


For more information, contact us on 01709-373782

 


Related links:
.Prime Minister's Award for Gateshead Millennium Bridge
.Lowry Centre Footbridge




M G Bennett and Associates Ltd is now part of the Atkins - the official engineering design services provider for the London 2012 Olympic and Paralympic Games Group
Atkins - the official engineering design services provider for the London 2012 Olympic and Paralympic Games
 
Gateshead Millennium Bridge - Moving Pedestrian Bridge
Gateshead Millennium Bridge - Moving Pedestrian Bridge

Installation of bridge deck
Deck in fabrication works
Left:  Bridge lowered | Right: Bridge Open
     
Bridge complete and in lowered position
Bridge fully open (tilted)
View from other bridge
     
Click thumbnail for larger image

Printable PDF
Media Coverage
Pdf
Video
Media



Other projects and services: