Bennett Associates

Engineering Design Consultants

RSS feed

Port Tawe Footbridges and Walkway Design

 
   

Continued...

There is a hydraulic power pack mounted on the east abutment for the east side swing bridge locking pin, gates and bridge and a power pack on the west abutment for the west side swing bridge locking pin and gates. Control of the system is from an existing two-storey building located on the west quay wall.

The swing bridges are approximately 11m long with a nominal central pivot point on one side. The bridges are designed to swing through approximately 90 degrees to provide a clear opening of 12.5m to match the clear width of the lock.

There is a special 1.4m high parapet suitable for use by pedestrians and cyclists.

For more information, contact us on 01709-373782.

 

 

 
   

Previous PagePage 1Page 2


 
Port Tawe Footbridges and Walkway Design

Port Tawe Footbridges and Walkway Design
Port Tawe Footbridges and Walkway Design
Port Tawe Footbridges and Walkway Design
     
Port Tawe Footbridges and Walkway Design
Port Tawe Footbridges and Walkway Design
Port Tawe Footbridges and Walkway Design
     
Move mouse over images to enlarge

Printable PDF
pdf