Engineering Design Consultants

Atkins - the official engineering design services provider for the London 2012 Olympic and Paralympic Games
RSS feed

Nuclear High Integrity Lifting Equipment

 
   

Key Elements

Understanding the UK regulatory thinking and thought process

We have developed a close understanding of the requirements expected by the UK Regulator

  • NII: Safety Assessment Principals (SAP’s) & Associated Technical Assessment Guides
  • ASME-NOG-1, ASME-NUM-1, KTA3902

Understand in detail the major technical challenges of the equipment suppliers

We have a depth of detailed knowledge through staff who have come from the manufacturing side of the industry:

  • Single failure tolerant
  • Fault load tolerant
  • Seismic

Understand the key drivers across the disciplines and integrate these disciplines

We have an in-depth understanding of the design and detailed design of the critical components within a station.

  • Safety Case
  • Deterministic assessment
  • Probabilistic assessment

Our Mechanical Team

  • Have the knowledge and experience of most sectors required in the delivery of a nuclear power station and also the requirements of the Ministry of Defence
  • We understand the UK regulatory process and thought process
  • We have a broad range of proven expertise required for high integrity design
  • We understand the issues relating to detailed design and manufacture of safety critical mechanical equipment
  • We have a proven record in solving general engineering challenges in the whole spectrum of mechanical engineering
For more information, contact us on 01709-373782

 
   




You may also be interested in:

Channel Tunnel Project
British Antarctic Survey - The Drewry Summer Accomodation Building
Newman's Sluice


M G Bennett and Associates Ltd is now part of the Atkins - the official engineering design services provider for the London 2012 Olympic and Paralympic Games Group
Atkins - the official engineering design services provider for the London 2012 Olympic and Paralympic Games
 
B30 Skip Handler Class 2 - Critical item impact Gimble
B30 Skip Handler Class2 - Critical item impact
Gimble

.

Dungeness 'B' Gas Circulation Cranes Class 2
Sizewell 'B' Polar Crane Class 1 Crane
DML Dockside Cranes Class 1 Structure Class 2 Mechanisms
     
B30 Skip Handler Class2 - Critical item impact Gimble
Maswep store Charge Machine Class 2
Thorpe (Sellafield) Rack Handler Class 2
     
Click thumbnail for larger image
.

Add to Brochure
Printable PDF



Plan Design Enable